About progressive tooling area Sad
Post Reply   Forum
Posted by: martin_mjohn ®

02/20/2006, 03:03:11

Author Profile eMail author Edit

Pl any one could help me!

work nature is : to produce metal blanks with precision 2 holes thick is 1.5 mm to 2 mm.

my problem is
* to improve the bore staightness,
* to improve the MTBG ( mean time between grinding )at present we are at 1000 kgs.
* to avoid blanking punch chip out and weld( metal pick up)









Post Reply | Recommend | Alert Administrator View All   | Next |

Replies to this message


Re: About progressive tooling area Smile
Re: About progressive tooling area -- martin_mjohn Post Reply Top of thread Forum
Posted by: Kelly_Bramble ®

02/22/2006, 16:31:48

Author Profile eMail author Edit

Engineers Edge has some generic information about progressive manufacturing here: /manufacturing/progressive_metal_stamping.htm







Post Reply | Recommend | Alert Administrator Where am I? Original Top of thread
Re: About progressive tooling area Question
Re: About progressive tooling area -- martin_mjohn Post Reply Top of thread Forum
Posted by: yjet ®

02/21/2006, 14:42:37

Author Profile eMail author Edit

please do email me with your exact requirements..
please state clearly..
material, sheet thickness, press tonage, attach cad drawing if possible, and total qty per week..
regards..







Post Reply | Recommend | Alert Administrator Where am I? Original Top of thread | |

Powered by Engineers Edge

© Copyright 2000 - 2024, by Engineers Edge, LLC All rights reserved.  Disclaimer