|
STRUCTURAL DESIGN | |||
Post Reply | Forum |
Posted by: pchan4rum ® 07/23/2006, 09:26:35 Author Profile eMail author Edit |
Dear Fellow members, I welcome your shared expertise and advise on the below: For structural welding in accordance to AWS D1.1, with majority TKY joints; 1. If all weld connections are full-pen, 100% UT is required, is MPI essential as per code? 2. If we have a 200mm thick EH36 plate butt-welded to a 90mm thick EH69 plate, is PWHT required as per AWS? 3. Is EH69 (Yield 690 MPa) an AWS material grouping?
|
Post Reply | Tell a Friend (must be logged in) | Alert Admin About Post |
Powered by Engineers Edge
© Copyright 2000 - 2024, by Engineers Edge, LLC All rights reserved. Disclaimer