This is a serious issue and it involves a lot more than simple deflection. A 250ft high crane needs to have safety factors designed into the vertical support.
The jib section traditionally has a traveling counter-weight on the tail end and deflection can be both up and down at any given time with uneven loads on each end of the jib.
This is a job for Structural Engineer well versed in crane design.