Results 1 to 3 of 3

Thread: How to get away from dimensionally Inspecting assemblies

  1. #1
    Associate Engineer
    Join Date
    Jan 2016
    Posts
    1

    Confused How to get away from dimensionally Inspecting assemblies

    I couldn't find a similar thread so here it goes. I was challenged today by a production supervisor he asked me if there is anyway that we could get away from dimensionally inspecting an assembly that his value stream assembles.

    My response to him was "if the process capability and repeatability (Cp/Cpk) of a supplier I such hat I can be validated for X number of details then you can have ***** that all of your builds will fall into tolerance.

    Does anyone know of any other way?

  2. #2
    Technical Fellow Kelly_Bramble's Avatar
    Join Date
    Feb 2011
    Location
    Bold Springs, GA
    Posts
    2,625
    Let's backup a little...

    Why and what on the assembly is being dimensionally inspected in the first place?

    • Is there an mechanical adjustment?
    • Customer requirement?
    • Can the assembly be rejected by the customer for high probability out of conformance?
    Tell me and I forget. Teach me and I remember. Involve me and I learn.

  3. #3
    Technical Fellow jboggs's Avatar
    Join Date
    Mar 2011
    Location
    Myrtle Beach, SC
    Posts
    908
    Refer to him the philosophies and processes developed by Dr. D.W. Deming. Sat thru 18 hours of video of his absolutely BORING voice. Ugh. But his statistical approach (SPC) is invaluable if applied correctly.

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •